Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Singapore (Sunlight)
Vietnam

Middle East & Africa

CHINT-EGEMAC
South Africa
UAE

Europe

Italy
Spain
Turkey
Kazakhstan

North America

Mexico

Latin America

Brazil
Peru

Choose your country & Language

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Singapore (Sunlight)
Vietnam
CHINT-EGEMAC
South Africa
UAE
Italy
Spain
Turkey
Kazakhstan
Mexico
Brazil
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT Helps Build Huaneng UK 99.8MW Minety Project

DECEMBER 29, 2021

On December 15, CHINT was invited to attend the online commencement ceremony of battery energy storage project of British Stonehill (Minety phase II) developed by China Huaneng Group Co., Ltd.

Previously, CHINT provided a complete set of transformer products for phase I Minety project, which won the trust and recognition of Huaneng Group with high-quality products and professional services.

After the completion of Minety battery energy storage project, it will mainly participate in peak shaving and frequency modulation, fast frequency response, black start, capacity market and other services in the UK power market, which will help improve the UK Power Grid’s ability to accept renewable energy, effectively improve the resilience of the local power grid to cope with peak and valley shocks, improve the operation safety and stability of the power system, create jobs and contribute taxes for the local power market, bringing good social and economic benefits.

The designed installed capacity of Stonehill project is 49.9 MW and the energy storage capacity is 99.8 MW. During this cooperation, CHINT products will play an important role in transformer guarantee in Minety phase II battery energy storage project and jointly help the rapid layout and development of Huaneng battery energy storage project in the UK.

As a demonstration project of cooperation between China and the UK in the field of new energy, Stonehill project was listed as one of the 18 projects supporting green and low-carbon development in the UK at the UK Global Investment Summit, which will provide important support for the stable operation of West London power grid and help the UK achieve the goal of “2050 net zero emission”. British Prime Minister Boris Johnson said that these projects are the beginning of the establishment of a new partnership for green growth in Britain.

The Latest
JANUARY 23, 2025 CHINT’s Innovative Products Leading Data Centers’ New Era

In response to this trend, NIPower DC7000, the latest generation of integrated power modules from CHINT, has made its debut.

JANUARY 23, 2025 CHINT Unveils ESG Strategy for Global Business Sustainability

CHINT unveiled its 2030 sustainable development strategy, making a milestone in its commitment to a greener future.

JANUARY 23, 2025 CHINT X Wenzhou Rail Transit Power Distribution Project

CHINT has empowered Phase 1 of Wenzhou Rail Transit Line S2 with cutting-edge solutions.

JANUARY 22, 2025 CHINT x Xiong’an Power Empower Smart City Development

CHINT has been deeply involved in the Jinhu Future City Project, customizing a new low-voltage power distribution system solution that can access photovoltaic new energy for it.

JANUARY 22, 2025 CHINT Group 2030 Sustainable Development Strategy

The sustainable development organizational structure allows CHINT to more effectively achieve sustainable development goals and lay a solid foundation for the long-term development.

JANUARY 22, 2025 Introduction of CHINT Prefabricated Substation

We are proud to introduce our innovative and efficient product- CHINT Prefabricated Substations!

JANUARY 14, 2025 CHINT X CSG Conquering Low-volt Challenges for Smart Grid

In the wave of energy transformation, CHINT marches forward bravely and embraces China Southern Power Grid (CSG) closely.

DECEMBER 30, 2024 CHINT x State Grid Shandong Boosting PV with Smart Solutions

The application of the low-voltage distributed photovoltaic system has made the grid-connection status, operating parameters, power quality, and electricity safety controllable and observable.

DECEMBER 30, 2024 Global Celebration, Hanging Dreams on the Christmas Tree

CHINT employees from across the globe briefly set aside their year-long hustle and bustle, allowing themselves to be fully immersed in this moment of peace and delight.

DECEMBER 20, 2024 CHINT 2024 Cool Season Wraps up Successfully!

Spanning four months, five continents and more than 20 countries, 2024 Cool Season III came to a successful conclusion!