CHINT played a pivotal role in the design of the MNL1 T3-level data center in Manila, Philippines, the country’s largest data center park, featuring a PUE of 1.3 and being the first green data center in the Philippines.
For Phase I of the project, CHINT, as the solution provider, equipment supplier, and system integrator, delivered a comprehensive low-carbon solution, covering everything from low-voltage systems to the data hall. This included two 40-foot CUPS containers, housing electromechanical equipment such as low-voltage switchgear, UPS, battery cabinets, HVAC, and fire protection systems, along with two 20-foot containers containing oil-immersed transformers and ring main units. For the data hall, CHINT supplied eight precision power distribution units to provide reliable power to the loads of the data center.
Case Studies
Norway
Data Center Project
Singapore
Kingsland Data Center Project
Singapore
CapitaLand 9 Tai Seng Data Center Project
Singapore
PSA Data Center Project
Singapore
ICAP Data Center Project
Malaysia
Data Center Project
Malaysia
Keppel Data Center Project
China
Hunan Yiyang Furong Cloud Computing Data Center EPC Project
China
Tencent Data Center Pre-fabricated Substation Project
China
China Unicom Guiyang Guanshan Lake Bureau Room Power Supply Low-voltage Expansion Project