Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam

Middle East & Africa

CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN

Europe

France
Italy
Spain
Turkey
Kazakhstan
Netherlands

North America

Mexico

Latin America

Brazil
Peru
Ecuador

Choose your country & Language

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam
CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN
France
Italy
Spain
Turkey
Kazakhstan
Netherlands
Mexico
Brazil
Peru
Ecuador

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT Protects the Electricity Usage in Kuwait

APR 9, 2021

In 2019, an electrical breakdown happened to the Alstom GIS that has been operating in Kuwait for 25 years, which directly caused the local Omariya substation to lose power and could not supply power normally. In February 2020, CHINT received an inquiry from NCC (National Contracting Co. LTD.), the EPC contractor of the project, and immediately established an Omariya project team to ensure the efficient operation of all parts. From the cooperative design of with Alsoom, product quotation, contract signing, raw material production, to the on-site installation and commissioning of 25 132kV GIS with double-spaced busbars, CHINT has overcome various inconveniences caused by the epidemic in a short period of 5 months and successfully sent power.

The journey of a thousand miles begins with a single step. The successful signing of CHINT’s contract was not accomplished overnight. As early as 2014, CHINT passed the pre-qualification of the Ministry of Water and Electricity (MEW) of Kuwait, and embarked on the road of competing with companies in Europe, America, Japan and South Korea. Since 2015, CHINT has successively served as Kuwait Petroleum Corporation and National Hydropower Corporation, and have provided equipment for dozens of substation engineering projects such as the Ministry of Housing and Welfare, and have supplied more than 300 bay GIS and multiple power transformers and put them into use, which further guarantees the local people’s life and industrial production power, quality and service reputation. 

In 2019, CHINT successfully won the Mutlaa substation EPC project of the Housing and Welfare Department and became the first Chinese private enterprise to enter the general contracting market of Kuwait substation engineering. Now, through continuous learning and exploration of the local power grid, CHINT has successfully implemented the Omariya project, which has once again added a lot of meanings to the Chinese company in the Kuwait power market.

During the implementation of the project, CHINT's professionalism and product maturity have been highly recognized by customers. The local authoritative magazine in Kuwait carried out a large-scale report on the smooth implementation and significance of the project, which greatly enhanced CHINT's local brand image and laid the foundation for further expansion of the power market in Kuwait and the Middle East in the future.

The Latest
JULY 14, 2025 CHINT Q2 2025 Product Highlights

Discover CHINT’s Q2 2025 innovations—9 new low-voltage solutions designed for safety, reliability, and global performance in power distribution.

JUNE 27, 2025 CHINT Shines at the AEF 2025, Shaping the Future of Energy

CHINT highlights cutting-edge power solutions at the Africa Energy Forum 2025, supporting Africa’s sustainable energy transformation through innovation and localization.

JUNE 26, 2025 Did you know CHINT?Global Reach, Local Impact

Discover how CHINT delivers tailored electrical solutions across 140+ countries, solving local infrastructure challenges with innovative, smart technology.

JUNE 24, 2025 Empowering Thailand’s Food Industry with Reliable Power Solutions

Discover how CHINT provided Prawit Farm with reliable low-voltage power distribution solutions, ensuring continuous and efficient operations for their new food processing factory in Thailand.

JUNE 18, 2025 Building a New Energy Ecosystem, CHINT Appeared at SNEC 2025

Discover CHINT’s smart microgrids, green tech innovations, and ESG strategy as they reshape the global energy landscape at SNEC 2025.

JUNE 17, 2025 Join the challenge! The 2025 CHINT Cup Global Youth Innovation Contest is now open!

Enter the CHINT Cup 2025 for a chance to showcase cutting-edge innovations in AI, energy, and technology. Global youth welcome. Attractive prizes await.

JUNE 15, 2025 CHINT Wraps Up SENDI 2025 Showcasing New Local Meter Factory

At SENDI 2025, CHINT unveiled its Manaus smart-meter plant, boosting Brazil’s grid with sustainable tech and 350+ new jobs.

JUNE 8, 2025 NOARK Electric has a new address in Czech Republic

NOARK Electric has relocated to Harfa Office Park in Prague 9. Learn about their expansion, new showroom, and upgraded workspace.

MAY 29, 2025 Building Smarter, Greener Data Centers Worldwide

Discover how CHINT is leading the way in constructing eco-friendly, high-efficiency data centers in the Philippines, Indonesia, and China with innovative, low-carbon solutions.

MAY 29, 2025 Did you know CHINT?Every Role Has the Power to Shine

Discover the inspiring stories behind CHINT. Learn how our diverse team, from engineers to sales, drives innovation and proves that every role has the power to shine.